Ready-mix concrete pricing depends on your mix strength, volume, delivery distance, and site access — not one flat rate per load. Use the calculator below to work out your volume, then get a firm quote from dispatch.

Get a Quote →Call Dispatch: (647) 465-1114
AA
AlAAAUTHOR

Construction writer & concrete industry enthusiast based in Toronto. Covering ready-mix concrete pricing, batch plant operations & concrete supply and the GTA concrete trade.

LOCATION
Toronto, ON
EXPERTISE
Concrete & Construction
◆ 01 / WHAT AFFECTS PRICE

No flat rate.
Six factors.

Every quote is put together from your project specifics. Here's what we factor in before giving you a number.

Mix Strength

Higher MPa mixes (32–50) cost more than standard 20 MPa residential mixes — the mix design is priced by cement content and admixtures, not just volume.

Order Volume

Larger single-load orders are more efficient to price than small or partial loads. There's typically a short-load fee below a minimum volume threshold.

Delivery Distance

Sites further from our Etobicoke plant, or outside standard hours, may carry a distance or scheduling factor.

Site Access

Tight lanes, low wires, soft ground, or pump requirements can change which truck we send and how the job is priced.

Additives

Fibre reinforcement, accelerators, colour, or air entrainment beyond standard specs are priced on top of the base mix.

Timing

Same-day or after-hours orders may be priced differently than a standard scheduled delivery booked in advance.

◆ 02 / WORK OUT YOUR VOLUME

Start with
volume.

Volume is the biggest input into any quote. Enter your dimensions below — waste is factored in — then send the result to dispatch with your mix requirement.

Units
Volume needed
1.89
2.47 yd³ · order 2.08 m³ with 10% waste
Trucks required
1 ×
9 m³ standard mixer · GTA delivery
◆ 03 / HOW QUOTING WORKS

Three steps
to a quote.

01

Tell us the job

Volume, mix strength (or the application — driveway, slab, footing), and your site address.

02

We confirm access

Tight lanes, low wires, soft ground, or a pump requirement all factor into which truck we send and the final number.

03

You get a firm quote

Usually within 2 hours during business hours, with the price tied to your specific job, not a generic rate.

◆ 04 / FAQ

Pricing questions.

How much does ready-mix concrete cost in Toronto?

It depends on the mix strength, volume, delivery distance, and site access — there isn't one flat price per cubic metre that applies to every job. Give dispatch your project details and we'll quote it directly.

Do you charge by the cubic metre or cubic yard?

We price and batch in cubic metres, the standard unit for ready-mix concrete in Ontario. Our calculator on this page converts to cubic yards if that's easier to work with.

Is there a minimum order or short-load fee?

Mixers hold up to 9 m³. Partial loads under a certain volume typically carry a short-load fee — call the desk for current minimums before you order.

Do you provide free quotes?

Yes. Tell us the volume (or use the calculator below), the mix strength you need, and your site address, and we'll get back to you with a quote — usually within 2 hours during business hours.

Does price change for same-day delivery?

Standard same-day dispatch before our 10 AM cutoff is treated as a normal order. Rush requests outside that window or outside standard hours may be priced differently — ask dispatch when you call.

Is delivery included in the price?

Delivery within our standard GTA service area is part of the quote. Confirm with dispatch if your site is outside our usual routes.

Ordering for a specific project? See ready-mix delivery or our full-service concrete contracting.

◆ GET A QUOTE

Get your
firm price.

Volume, mix, address, and pour time. We'll come back with a price tied to your job — usually within 2 hours during business hours.

Direct dispatch(647) 465-1114
Quote deskinfo@yyzconcrete.com
After hours(647) 465-1114
01 · Project
02 · Mix & volume
03 · Site & schedule
04 · Contact
What are you pouring?